Preparing Concrete Basement Floor For Carpet

But this direct installation will result in a floor that s cold underfoot.
Preparing concrete basement floor for carpet. They work as wall to wall carpeting or as an area rug and the carpet squares can be replaced individually as needed rather than needing to replace the entire carpet. Choose the right materials. Remove any carpet or other flooring. Determine how much flooring and materials will be needed.
Installing carpet tiles aka carpet squares over concrete is a simple process that most people can do without any experience. Multiply length times width of the room. Add about 10 to that number to account for any possible mistakes and warped boards. Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight.
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing. If you have a vinyl floor you may be able to install your flooring directly on top of it. Many basement flooring materials like paint epoxy tile and rubber flooring for example can go down directly over the basement s original poured concrete floor as long as the concrete is in good condition. Install dimpled polyethylene to create an air space between the concrete and the finished floor sealing off dampness and giving moisture a chance to dissipate.
Prevent damp basement floors from ruining carpet and other finished flooring. Also it is important to take time and prepare well before you start assembling. Again make sure the flooring is suitable for use over concrete and follow the manufacturer s instructions for prepping the slab and installing the vinyl. Use option a to keep your floor dry if you have damp floors.
Most traditional laminates are made with a waterproof surface layer a decorative layer and then fiberboard backing this backing is what is susceptible to moisture and if it comes in contact with liquids it can warp twist rot and start to grow mold and mildew. If you don t have all the tools or you want to be 100 sure you don t waste any material invite a friend over to help you. Test the floor for moisture. Leave the vinyl in place for 72 hours.
If you have made the decision to refinish your basement the renovations probably include the installation of a new carpet. The steps in this guide on how to install vinyl plank flooring on concrete are quite easy to follow. Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company.